Fourteen AccessRamps & home mods · Bayswater

Access ramps & home modifications · Perth’s inner east

One in fourteen, or we tell you why not.

AS 1428.1 ramps and home modifications across Bayswater, Maylands, Morley and Bassendean. Set your rise and the length you’ve got, and see the run, the landings and the price before you ring.

Modifying homes since 2016 Registered building contractor BC00000 We read your OT’s report with you

On the drawing right now

$10,1209.1 m of ramp and landings for a 480 mm rise, at 1:14, in modular aluminium.

The Rise · drawn to scale

Set your rise and your setback. We’ll draw what fits — at true scale.

Elevation of the ramp, drawn at equal scale in both axes A side view of the house wall, the door threshold, the ramp at its true gradient with its landings, and a vertical line marking the length available.
Rise at the thresholdhow far the floor sits above the ground
480 mm
Length you havewall to fence, kerb or path
10.0 m
GradientAS 1428.1 ramp gradients
Formstraight run, or folded back on itself
Materialboth finished non-slip
Which doorchanges the drawing, not the price

Which door doesn’t change the price. The rise and the run do.

Drawn at equal scale in both axes. The 1 m bar on the drawing is the reference. Send this drawing with my enquiry

What the drawing is telling you

A 480 mm rise, drawn at 1:14 as a straight run in modular aluminium. The ramp itself is 6.7 m long; with a 1,200 mm landing at the top and another at the bottom, the whole thing takes 9.1 m of your 10.0 m. Two landings. Total $10,120.

AS 1428.1-2009 · 1:14 max ramp gradient · 9.0 m max flight · 1,200 mm landings · 1,540 mm change of direction · below 190 mm it is a step ramp at 1:10, below 35 mm a threshold ramp at 1:8

Why the aspect matters

Equal scale in both axes, always. Stretch the height and a 1:14 ramp looks like a 1:6 one — the oldest trick in the trade, and the reason people are surprised by the quote and surprised again by the fence they’ve lost. Everything above is drawn at one scale, both ways.

Frame: 11.5 m across · 1 m = 84 px

What it costs

Six things we do, with the numbers attached.

Supplied, fitted and made good. Rates are per metre of ramp run — the sloped part — and the landings are priced separately because they are the part people forget. Everything sits inside a $650 minimum for a visit.

01

Threshold ramp

Up to 35 mm of sill — a door track, a shower hob, a single tile step. AS 1428.1 lets a threshold ramp run at 1:8, so 35 mm is 280 mm of ramp. Aluminium, screwed and sealed, done in an hour.

from $650the job prices at $340; the $650 visit minimum is what you pay
02

Step ramp to 190 mm

One step, or a low porch lip. At this rise AS 1428.1 lets it be a step ramp at 1:10 — no handrails, no landings, no engineering. A 160 mm step is 1,600 mm of ramp.

$890flat, supplied and fitted, any rise to 190 mm
03

Modular aluminium ramp

Bolted, non-slip GRP decking, no footings, and it comes out cleanly when it is no longer needed. The usual answer for a rental or a discharge next week.

$780 per metre of runbilled to the whole metre of ramp run
04

Poured concrete ramp

Broom-and-seal non-slip finish, edge-thickened, tied into your path. Permanent, silent underfoot, and it lifts the house’s resale.

$1,150 per metre of runbilled to the whole metre of ramp run
05

Landings

1,200 mm top and bottom, every time — that’s the standard, not an upsell. A 1,540 × 1,540 landing where the ramp turns back on itself.

$1,150 straight$1,690 for a 1,540 mm switchback landing · aluminium rates
06

Handrails both sides

865–1,000 mm, continuous, with the 300 mm extensions top and bottom. Kerb rails to stop a castor going over the edge.

$240 per metre of runto AS 1428.1, both sides, on either material
  • Modifying homes since 2016 — around 340 ramps across the inner east
  • Built to AS 1428.1-2009 — gradient, landings, handrails, kerb rails
  • Registered building contractor BC00000 (placeholder number, demo page)
  • We work to your OT’s report and we’ll sit down and read it with you
  • NDIS home modifications quoted line-by-line against your plan
  • $20m public liability · ABN 00 000 000 404 (placeholder)

Demo reviews

Three people, three different answers.

“Mum’s discharge was the Thursday. They came on the Monday, drew the verandah at 1:14 on the spot, and told us the front was 400 mm too tight but the side path wasn’t. Ramp was in on the Wednesday.”

Ngaire T.Bayswater · 520 mm rise, side path, aluminium

“My plan manager had knocked back two quotes because they didn’t match the OT report. This one had the gradient, the landing sizes and the handrail metres on separate lines. Approved first go.”

Dev R.Morley · NDIS home modification, concrete ramp

“I’d been quoted for a four-metre ramp I had nowhere to put. They measured the step at 30 mm, said it wasn’t a ramp job at all, and fitted a threshold ramp for the minimum. Honest people are rare.”

Suzanne M.Maylands · café entry, 30 mm sill

Where we work

Inner and eastern suburbs, both sides of the river bend.

We keep the van inside about twenty minutes of Bayswater so a measure-up is a same-week job, not a fortnight’s wait. Outside this ring we’ll still come — we just tell you honestly when.

Service area map A simplified map of Perth’s inner eastern suburbs around the Swan River: Bayswater, Maylands, Mount Lawley, Morley, Bassendean, Guildford, Belmont and Victoria Park. Bayswater Maylands Mt Lawley Morley Bassendean Guildford Belmont Victoria Park SWAN RIVER Service area map The same service area drawn for a narrow screen: Bayswater at the centre, with Morley, Mount Lawley, Maylands, Bassendean, Guildford, Belmont and Victoria Park around it, and the Swan River running through. Bayswater Morley Mt Lawley Maylands Bassendean Guildford Belmont Vic Park SWAN RIVER

The dashed ring is about twenty minutes from the Bayswater yard.

  • Bayswater
  • Maylands
  • Mount Lawley
  • Morley
  • Bassendean
  • Guildford
  • Belmont
  • Victoria Park
  • Inglewood
  • Ashfield
  • Embleton
  • Rivervale

Book a measure-up

Tell us the rise. We’ll bring the tape and a level.

A measure-up is free and takes twenty minutes. We’ll measure the rise properly with a level and a straight edge, check what you’ve got to the fence, and leave you a drawing and a fixed price. If a compliant ramp won’t fit, we say so at the door — not at handover.

Numbers, spaces, brackets and dashes.

A hospital discharge date is the one that moves us to the front of the list. Leave it blank if there isn’t one.

Rough is fine. Height of the step, how many, and roughly how far you’ve got to the fence or the kerb.

Filled in from the drawing. Change it up there and this follows.

Or call (08) 9000 0404

We call back the same day, or first thing if it’s after five. Nobody at this end works Sundays.

What we’d want on the day

The OT report if there is one, a rough idea of the discharge date, and somewhere we can stand a 3 m straight edge. If the house is a rental, the owner’s name — a modular ramp comes out clean, but the agent still wants to know.

Free measure-up · fixed price in writing · no deposit until you’ve seen the drawing

If you’re in a hurry

A threshold or step ramp is usually same-week. A modular aluminium ramp is one to two weeks from deposit. Poured concrete is three to four, because the slab has to cure before anyone puts weight on it — there is no version of that we can rush.

(08) 9000 0404 · Mon–Fri 7am–5pm · Sat by arrangement

Questions we get

Six answers, including the one nobody wants.

Why 1:14, and where does that number come from?

AS 1428.1-2009 — the Australian Standard for design for access and mobility — sets 1:14 as the steepest gradient a ramp may be built to, with a maximum flight of 9.0 m before a landing. It is not a comfort figure. It is roughly the limit at which an average person can self-propel a manual wheelchair up a slope and, more importantly, control the descent. The Disability (Access to Premises) Standards and NCC Volume One Part D4 both point back at it for commercial work, and it is what an NDIS home modification gets assessed against.

1:14 is the ramp figure, and the standard is stricter than most quotes admit about what is and isn’t a ramp. Under 190 mm of rise it is a step ramp, capped at 1:10 — a 160 mm step gets 1,600 mm of ramp. Under 35 mm it is a threshold ramp, capped at 1:8. Neither needs handrails or landings, which is why both are flat-priced above. The 1:8 gradient with a 1,520 mm maximum length that gets quoted at step ramps all over the trade belongs to a kerb ramp — the wedge at the end of a footpath — and it does not apply to a step at your front door. Built to that figure, the same 160 mm step comes out 1,280 mm and is too steep.

Our name is the number. If we can build you one in fourteen, we will. If we can’t, you get told why on the first visit.

Why does a ramp need landings, and how many?

A 1,200 mm landing top and bottom, always — you need somewhere flat to open a door and somewhere flat to stop at the bottom. Those two are in every ramp price on this page and they are why the run and the footprint are different numbers.

After that it depends on the gradient. At 1:14 you get 9.0 m of flight before an intermediate landing is required; at 1:16 it’s 12.0 m. At 1:20 it is technically a walkway rather than a ramp, and no intermediate landing is required at all — which is why a 1:20 answer sometimes ends up shorter overall than a 1:16 one even though the slope is gentler. Fold the ramp back on itself and the turn needs a 1,540 × 1,540 landing so a wheelchair can actually get around it.

What if a compliant ramp won’t fit?

Then we tell you, on the page above and on the day, and we don’t build it. A 1,200 mm rise wants 20.4 m of ramp and landings at 1:14 in a straight line. Folded as a switchback at 1:16 that comes down to 13.1 m. If you haven’t got 13.1 m, no arrangement of a compliant ramp fits your house.

A non-compliant ramp is worse than nothing: it fails at handover, it doesn’t get funded, and someone still has to get down it. What you want at that point is a platform lift or a through-floor lift. We don’t install them and we don’t take a commission on them — we’ll give you two names and get out of the way.

How do the NDIS and an OT report affect the price?

They don’t change our rates. What they change is the paperwork. Anything structural under the NDIS home-modification framework needs an occupational therapist’s recommendation and a registered building practitioner doing the work, and the quote has to line up with what the OT actually wrote — gradient, landing sizes, handrail type, surface finish, all of it on separate lines rather than one lump sum. That is the single most common reason a home-modification quote gets sent back.

We are not occupational therapists and we don’t write the report. We read yours, we quote to it, and if we think the OT’s recommendation won’t build we ring them, not you.

Aluminium or concrete — which one do I want?

Modular aluminium at $780 a metre of run is bolted together on adjustable feet, needs no footings, goes in over a day or two, and comes back out cleanly. It is the right answer for a rental, for a discharge next week, and for anything you hope is temporary.

Poured concrete at $1,150 a metre of run with a broom-and-seal non-slip finish is silent underfoot, will not move, and reads as part of the house rather than as equipment bolted onto it. It’s the right answer for a home someone intends to stay in. It also takes three to four weeks because the slab has to cure.

What don’t you do?

We don’t install platform lifts, stair lifts or through-floor lifts. We are not occupational therapists and we won’t write you a report. We don’t do bathroom modifications beyond a threshold ramp at the shower hob. And we won’t build a ramp steeper than 1:14, at any price, for any deadline — not because we’re precious about it, but because it is the one thing on this page that cannot be undone once the concrete is off the truck.

This is a demonstration build by Sapience Analytics.

Want one pointed at your customers? We build conversion pages for trades and service businesses across WA — with the calculator, the drawing and the honest refusal all coming from your real numbers.

Ring Rob Get it drawn