Driveways — plain grey
from $70/m²
125 mm, vehicle-rated mesh, steel-trowel or broom finish. Crossover paperwork handled — the verge is the shire's; the forms are ours.
Baldivis · first pour 5:30am
The job is won or lost when the forms are set. We set them before sunrise, pour 25 MPa mesh-reinforced, and hand you a finish you chose off a real estimate — not a guess on the back of a card.
Slab & finish estimator
Every finish rendered as it pours, every figure from the same rate card we quote off. Confirmed at a 20-minute site measure.
| Use | Driveway |
| Area | 40 m² |
| Finish | Exposed aggregate — $100/m² |
Minimum job $1,800 applies — boxing, mesh, a truck and a crew turn up whether it's 15 metres or 50. The minimum is what makes small jobs honest.
125 mm vehicle-rated slab. You drive on it at 7 days, not 3 — anyone who says sooner is selling you cracks.
25 MPa · MESH REINFORCED · CUT OR TOOLED JOINTS · ≈5.0 m³ · ONE TRUCK
Rate card
All rates 25 MPa, mesh reinforced, cut or tooled joints, cleaned up behind us. If a cheaper quote doesn't say that, ask what got cut.
from $70/m²
125 mm, vehicle-rated mesh, steel-trowel or broom finish. Crossover paperwork handled — the verge is the shire's; the forms are ours.
from $90/m²
Creamy, poured — not paved — and cool underfoot in February. The alfresco favourite south of the river.
from $100/m²
Seeded stone, washed and sealed. Grip in winter, no glare in summer, and it hides sand better than anything else we pour.
from $140/m²
Ground back to the stone and polished. The premium finish — flecks like terrazzo, sealed against coffee and rust drips.
to engineer's spec
Your shed company's drawings, our slab — thickenings and hold-down bolts where the plan says, levels the installer can check.
from $45/m²
Break, cart-off and tip fees at cost. We quote removal and the new slab as one number, so nothing turns up on the invoice twice.
Boxing, mesh, a truck and a crew turn up whether it's 15 metres or 50 — the minimum is what makes small jobs honest. And if there's no truck access to the back, a line pump is ≈ $650 on the day, at cost. We tell you at the measure, not on the invoice.
"We don't pour into a 34-degree afternoon or onto a soaked base. If we push your pour a day, that's the slab talking — not us."WEATHER POLICY
"The docket says 25 MPa because the mix is 25 MPa. You're welcome to read it when the truck arrives."MIX POLICY
Word around the estate
"The driveway was poured before the kids woke up. Boxing at five, truck at half past, and they were screeding by school drop-off. The exposed agg looks like the display homes'."
"Liquid limestone alfresco, and it's genuinely cool underfoot in February. They set the falls so the winter rain runs to the garden, not the door."
"Shed slab to the engineer's drawings — bolts where the plan said, and it passed the installer's level check without a shim. He asked who poured it."
Demo reviews — written for this demonstration, not collected from real customers.
Service area
Trucks batch out of the southern plants, so the corridor from Kwinana down to Mandurah's edge gets metro rates — no travel loading inside the map.
Straight answers
Per square metre, supplied and installed at 25 MPa with mesh and joints:
| Plain grey | from $70/m² |
| Liquid limestone | from $90/m² |
| Exposed aggregate | from $100/m² |
| Honed aggregate | from $140/m² |
What moves it: old slab out (from $45/m²), tight truck access (a line pump is ≈ $650 at cost), and steep falls that need extra formwork. A typical 40 m² double driveway in exposed aggregate lands around $4,000. Minimum job $1,800 either way.
Plain grey is the workhorse: cheapest, honest, broom-finished for grip. Exposed aggregate costs more but grips wet, hides sand, and doesn't glare. Liquid limestone is the one you walk barefoot on in February — it stays noticeably cooler — but it's a softer surface, so we keep it to alfrescos and paths rather than the driveway you turn a trailer on. Honed is the premium: aggregate ground back and polished like terrazzo.
100 mm standard for alfrescos and paths, 125 mm wherever vehicles run. Shed slabs go to your shed company's engineered drawings — thickenings and hold-down bolts where the plan says, not where habit says.
Seven days, plainly. You can walk on it at 24–48 hours, but concrete reaches driving strength at a week — anyone who says three days is selling you cracks. We'll cone it off and tell your paver or shed installer the same date we tell you.
For the slab on your own block, generally no. The verge crossover — where the driveway crosses council land to the road — is the shire's, and most LGAs in the corridor want a crossover application (some rebate part of the cost). We do the paperwork with the quote so it's approved before we box.
Yes — and it's the part you can't see, so it's the part cheap quotes skip. Baldivis sand compacts well but only if it's actually compacted: we plate-compact the base in lifts, wet it down, and pour onto firm, damp sand — never onto a soaked base after rain. Fill areas get extra passes. Compaction is why a slab stays flat; the concrete just holds the shape the base gives it.
Book a site measure
Tell us the job and we'd call you back within one business day to book the measure. Estimates from the tool above carry straight into the form.
Measures run Mon–Fri from 7am. Pour days start 5:30am — we'll warn the neighbours in writing before the truck does.
We'd call you back within one business day to book your site measure.
This is a demonstration page, so nothing was sent anywhere — on the live site, this enquiry would land in the crew's job system and we'd be in touch.