House demolition
from $8,800
Brick & tile at $110 per square metre of floor area — the from-price is an 80 m² cottage, every toggle off. Roof, frame and walls down in sequence behind exclusion fencing, dust watered the whole time.
Welshpool · Perth metro — demolition & site clearance
Permits lodged. Utilities abolished, not just disconnected. Asbestos surveyed and handled by licensed crews. Then about three days of excavator work — and your builder gets a block that is bare, level and certified.
Clearing since 2012 · WorkSafe asbestos removal Lic. AR 0000 · $20M public liability
Structure
Floor area
Floor area of the house, 80–300 m² — it drives every per-metre line below.
Scope
House demolition starts at $8,800 — that is 80 m² of brick & tile at $110/m² with every toggle off. Final price is set at the site assessment, in writing.
What we clear
Honest per-metre rates and flat jobs. Every figure below is the same arithmetic the planner uses — no surprises between this page and the written quote.
from $8,800
Brick & tile at $110 per square metre of floor area — the from-price is an 80 m² cottage, every toggle off. Roof, frame and walls down in sequence behind exclusion fencing, dust watered the whole time.
from $9,200
$85/m² plus the $30/m² asbestos line every fibro job carries — the from-price is 80 m² at $115/m² all-in. Licensed crews strip and seal the sheeting by hand before any machine starts.
$2,800 flat to 60 m²
One flat price for steel sheds and outbuildings up to 60 m² — beyond that, or anything odd, gets eyes on site first and a straight quote.
$9,500 flat
Drain, punch the shell, backfill and compact in lifts, compaction certificate filed. The certificate is what lets anyone ever build on it.
+$18/m²
Concrete broken, footings dug, everything carted to crushing for road base. Or leave the slab in — some builders want it; we note it on the handover either way.
+$30/m²
Survey, licensed removal crew, air monitoring, clearance certificate filed with the job. The certificate is the product — the skip is just logistics.
How it runs
The paperwork takes weeks; the teardown takes days. Here is the order everything happens in — the same order the planner animates.
The demolition permit is lodged under WA’s Building Act 2011. Western Power and ATCO abolish — not just disconnect — power and gas, and both sign off before a tooth touches a tile. Fees passed through at cost.
3–6 weeksYour neighbours get a letterbox note with dates and our number before the fencing goes up. Council-required pest baiting runs ahead of the machines — yes, rats. It is real, and it is on the checklist.
Week beforeExclusion fencing and signage up, the asbestos survey walked. Licensed removal first, by hand, with air monitoring — and a clearance certificate before anything structural moves.
1–3 daysAbout three days of excavator work on a standard house. Water on the dust the whole time. Roof, frame, walls, slab — in that order, behind the tape.
~3 daysConcrete and brick to crushing for road base, steel to scrap, green waste to mulch. Tipping general waste is the dear part, so we sort hard on site.
With teardownSand pad screeded level, compaction certificate where the job needs one, handover pack to your builder. The block is bare — that is the product.
Final dayWhat clients say
The block was bare, level and certified nine days before the builder’s contract date. The site supervisor rang to ask who we’d used.M. & T. Hardingknock-down-rebuild · Riverton
Corner-block clearance came with every certificate the settlement agent asked for — already filed, already named right. They’re on our next two sites.D. Okafordeveloper · Queens Park
We live next door. The note in the letterbox beat the fencing by two days, and the dust never crossed the boundary. You notice that.R. Callowayneighbour · Carlisle
Reviews are demonstration copy — this is a fictional business.
Where we work
The yard, the floats and the water cart live in Welshpool. House demolition runs Perth metro-wide; the flat shed and pool prices hold inside the ring — outside it they are still honest, just quoted with travel.
Straight answers
A brick & tile house runs about $110 per square metre of floor area — a 160 m² home lands near $17,600 before extras. Fibro-era houses price at $85/m² plus the $30/m² asbestos line they always carry. What moves the number: taking the slab and footings out (+$18/m²), green waste ($1,400 flat), access, and anything the survey finds. Sheds are $2,800 flat to 60 m²; pool fill-ins are $9,500 flat.
Survey first, always. A fibro-era house is treated as asbestos-containing until a clearance certificate says otherwise — licensed removalists strip and seal the sheeting by hand before any machine starts, with air monitoring, and the clearance certificate is filed with the job. Brick homes still hide it in eaves, wet areas and fences — the survey tells us.
The paperwork takes weeks; the teardown takes days. Permits and utility abolishments run 3–6 weeks depending on the council and the networks. Once the fencing goes up, the excavator needs about three days on a standard house.
Yes. The demolition permit is lodged under WA’s Building Act 2011, and we arrange the Western Power and ATCO abolishments — full abolishment, not just disconnection. Permit and abolishment fees are passed through at cost, itemised on the quote.
Concrete and brick go to crushing for road base, steel to scrap, green waste to mulch. Tipping general waste is the dear part, so we sort hard on site — it is why the machine takes the house apart in order instead of just knocking it over.
Tell us which ones at the assessment. Protection zones go into the plan before the fencing does, and “save the jacaranda” is a normal line item, not a special request.
Book it
We walk the block with you — access, trees, the neighbour’s fence, what the survey needs to look at — then the quote goes in writing. No obligation, no deposit until the permit is lodged.
Or call the yard: (08) 9000 0284 — Mon–Fri 6:30am–4:30pm
We’d call you back within one business day, walk the block with you, and put the quote in writing. Permits, abolishments and the asbestos survey get sequenced from there.
This is a demonstration build — no details were sent anywhere.
Bareblock Demolition is fictional — the planner, the pricing logic and the page around it are real. Want one pointed at your customers, with your rates, your suburbs and your paperwork behind it?