Dust management plan
Written to DWER’s dust guideline for your site and your council, with the controls, the contacts and the complaint procedure your super needs.
From $1,250 · $1,200 + $100/ha
Baldivis · dust and sand-drift management
Sand stays on your site, and the plan’s in before the start date. Plans, inspections and monitoring across Perth’s southern and eastern growth corridors.
Working from Baldivis since 2014 · 186 site dust plans written · $20m public liability · Ref. DMP-0000
Services
Everything a council condition or a neighbour’s complaint is likely to ask for, with the price on the tile.
Written to DWER’s dust guideline for your site and your council, with the controls, the contacts and the complaint procedure your super needs.
From $1,250 · $1,200 + $100/ha
We walk the boundary, check the fence, the watering and the stockpiles, and log each visit for your file.
$190 a visit · weekly Oct–Mar
A monitor on the boundary facing the homes, so a complaint meets a record instead of an opinion.
$320 a week · homes within 100 m
A neighbour has rung the council. We attend, check the controls against the plan and write it up for you to send.
From $190 a visit
Which haul roads, stockpiles and cleared lots get the cart, and when — written for your earthworks contractor to run.
Included with every plan
The whole works program for a stage: the plan, every inspection visit, and a monitor if homes are within 100 m.
From $1,630 for a small winter site
Not in our prices: your council’s own charges, if it has any, and the water cart. Neither is ours to set.
The estimate
Set the site area and the works program. The plan, the inspections, the monitor and the lodge-by date update as you go.
Plan, inspections and monitor
$9,760Plan, 16 weekly inspections and 16 weeks of monitoring.
Plan only
$1,600 Not a substituteLodge byMon 28 Sep 2026
14 days before your start — the City of Armadale’s lead time. Check your own council’s.
| Dust management plan$1,200 + 4 ha × $100 | $1,600.00 |
| Site inspections16 weekly visits × $190 | $3,040.00 |
| Dust monitor16 weeks × $320 | $5,120.00 |
| Total, rounded to the nearest $10 | $9,760 |
Plan only isn’t a substitute: a plan on file doesn’t keep sand on the site — the watering does, and that’s your earthworks contractor’s cart, not ours.
Before you book anyone
Your council decides whether a site needs a dust management plan and how far ahead it wants one. The City of Armadale publishes its requirements, and they’re a good example of what to ask yours:
Source: City of Armadale, Building, development and construction site management. Those are Armadale’s rules for Armadale sites; other councils set their own.
Plan only
$1,6004 ha, watering schedule included
Plan, inspections and monitor
$9,76016 weeks, homes within 100 m
The plan on its own isn’t a substitute for the rest. A plan on file doesn’t keep sand on the site — the watering does, and that’s your earthworks contractor’s cart, not ours. Inspections are how you know it’s being run.
How it works
01
We walk the boundary with you, note the homes within 100 m, and see which way the afternoon breeze will carry the sand.
02
The plan follows DWER’s guideline and carries the watering schedule your earthworks contractor runs.
03
We work back from your start date to your council’s lead time. Armadale asks for 14 days; we check what yours asks.
04
Weekly from October to March, fortnightly otherwise, logged so the file is ready if a complaint comes in.
From site offices
“Council wanted the plan before we could start stage 3. Sandline had it in with a week to spare, and the watering schedule went straight to our earthworks sub.”
“A neighbour rang about sand on her car on a Friday. They were on site Monday at seven, found the shade cloth down on the east side and wrote it up the same day.”
“Winter job, nobody within 100 m. They told us we didn’t need a monitor and took it off the quote.”
Reviews are demonstration copy written for this page.
Service area
Site somewhere else in the metro area? Ring (08) 9000 0605 and we’ll tell you straight whether we can cover the inspections.
FAQ
Your council decides, so ask it first. The City of Armadale publishes its rule: Dust Management Plans are required when works that are being carried out may have the potential to create dust.
Other councils set their own requirements. If yours is not Armadale, ring its environmental health team before you pay for anything.
Again, your council sets it. Armadale says the plan and application should be submitted to the City 14 days prior to the anticipated start date
, and Works should not commence until the Dust Management Plan is approved by the City.
The estimate works back 14 days using Armadale’s figure as the example. It is not a rule for any other council.
DWER’s guideline scores a site and places it in one of four classifications, 1 to 4. Where other land uses are within 100 metres, works in the dry period (1 October to 31 March) lift a class 2 site to class 3, and class 3 to class 4.
We work out your classification at the site look, not on a web page. The plan then sets out the controls — fencing, watering, stockpiles, stabilising cleared ground — who is responsible for each, the monitoring and the complaint procedure.
Ring us. A complaint visit is from $190: we attend, check the fence, the watering and the stockpiles against your plan, and write up what we found and what changed, ready for you to send on.
No. Watering is your earthworks contractor’s cart at your contractor’s rate. We write the schedule it follows and check on inspection that it’s being run — which is why a plan on its own doesn’t keep sand on site.
In visits, not in rates. From 1 October to 31 March we inspect weekly, because dry sand and an afternoon sea breeze are how drift complaints start. The rest of the year it’s fortnightly. A visit is $190 either way.
Book a site look
We ring back within one working day to book a time on site with you or your super.
Rather talk? (08) 9000 0605, Monday to Friday from 6:30am.
Enquiry received
We’ll book the site look and bring a priced plan for the size you gave us.
This is a demonstration page, so nothing has been sent. On the live site this would land in the office inbox and the CRM.