SandlineDust Management Call(08) 9000 0605 Book a site look

Baldivis · dust and sand-drift management

Dust management plans for building and civil sites, Mandurah to Byford.

Sand stays on your site, and the plan’s in before the start date. Plans, inspections and monitoring across Perth’s southern and eastern growth corridors.

Working from Baldivis since 2014 · 186 site dust plans written · $20m public liability · Ref. DMP-0000

$1,250a plan, from
$190a site inspection
Weeklyvisits, October to March

Services

Priced per plan, per visit and per week.

Everything a council condition or a neighbour’s complaint is likely to ask for, with the price on the tile.

Dust management plan

Written to DWER’s dust guideline for your site and your council, with the controls, the contacts and the complaint procedure your super needs.

From $1,250 · $1,200 + $100/ha

Site inspections

We walk the boundary, check the fence, the watering and the stockpiles, and log each visit for your file.

$190 a visit · weekly Oct–Mar

Dust monitoring

A monitor on the boundary facing the homes, so a complaint meets a record instead of an opinion.

$320 a week · homes within 100 m

Sand-drift complaint visit

A neighbour has rung the council. We attend, check the controls against the plan and write it up for you to send.

From $190 a visit

Watering schedule

Which haul roads, stockpiles and cleared lots get the cart, and when — written for your earthworks contractor to run.

Included with every plan

Plan, inspections and monitor

The whole works program for a stage: the plan, every inspection visit, and a monitor if homes are within 100 m.

From $1,630 for a small winter site

Not in our prices: your council’s own charges, if it has any, and the water cart. Neither is ours to set.

The estimate

Set the site area and the works program. The plan, the inspections, the monitor and the lodge-by date update as you go.

Your dust plan estimate

Our planning figures
Site plan sketch

Plan, inspections and monitor

$9,760

Plan, 16 weekly inspections and 16 weeks of monitoring.

Plan only

$1,600 Not a substitute

Lodge byMon 28 Sep 2026

14 days before your start — the City of Armadale’s lead time. Check your own council’s.

Try
4 ha
16 weeks
Dust management plan$1,200 + 4 ha × $100$1,600.00
Site inspections16 weekly visits × $190$3,040.00
Dust monitor16 weeks × $320$5,120.00
Total, rounded to the nearest $10$9,760

Plan only isn’t a substitute: a plan on file doesn’t keep sand on the site — the watering does, and that’s your earthworks contractor’s cart, not ours.

Before you book anyone

Ask your council first — and the guideline is free.

Your council decides whether a site needs a dust management plan and how far ahead it wants one. The City of Armadale publishes its requirements, and they’re a good example of what to ask yours:

  • “Dust Management Plans are required when works that are being carried out may have the potential to create dust.”
  • The plan and application “should be submitted to the City 14 days prior to the anticipated start date.”
  • “Works should not commence until the Dust Management Plan is approved by the City.”
  • Plans must adhere to the Department of Water and Environmental Regulation’s dust guideline.

Source: City of Armadale, Building, development and construction site management. Those are Armadale’s rules for Armadale sites; other councils set their own.

What you can do today, for nothing

  1. Ring your council’s environmental health team. Ask whether this site needs a dust management plan, and how many days before the start it wants one.
  2. Read DWER’s guideline. It’s free on wa.gov.au, and it’s what Armadale says plans must follow.
  3. If all you need is a plan on file, buy only the plan.

Plan only

$1,600

4 ha, watering schedule included

Plan, inspections and monitor

$9,760

16 weeks, homes within 100 m

The plan on its own isn’t a substitute for the rest. A plan on file doesn’t keep sand on the site — the watering does, and that’s your earthworks contractor’s cart, not ours. Inspections are how you know it’s being run.

How it works

From site look to the last inspection.

01

Site look

We walk the boundary with you, note the homes within 100 m, and see which way the afternoon breeze will carry the sand.

02

Plan written

The plan follows DWER’s guideline and carries the watering schedule your earthworks contractor runs.

03

Lodged on time

We work back from your start date to your council’s lead time. Armadale asks for 14 days; we check what yours asks.

04

Inspected through the works

Weekly from October to March, fortnightly otherwise, logged so the file is ready if a complaint comes in.

From site offices

What project managers and supers say.

“Council wanted the plan before we could start stage 3. Sandline had it in with a week to spare, and the watering schedule went straight to our earthworks sub.”
Project manager · land developer · Wellard
“A neighbour rang about sand on her car on a Friday. They were on site Monday at seven, found the shade cloth down on the east side and wrote it up the same day.”
Site supervisor · home builder · Byford
“Winter job, nobody within 100 m. They told us we didn’t need a monitor and took it off the quote.”
Civil superintendent · subdivision works · Piara Waters

Reviews are demonstration copy written for this page.

Service area

Southern and eastern growth corridors, from a Baldivis base.

Map of the southern and eastern growth corridors with service suburbs marked INDIAN OCEAN SOUTHERN CORRIDOR EASTERN CORRIDOR Darling Scarp Perth Yanchep, north Treeby Piara Waters Armadale Byford Wellard Mandurah Baldivis · our base

Southern corridor

  • Baldivis
  • Wellard
  • Treeby
  • Mandurah

Eastern corridor

  • Piara Waters
  • Armadale
  • Byford

North

  • Yanchep

Site somewhere else in the metro area? Ring (08) 9000 0605 and we’ll tell you straight whether we can cover the inspections.

FAQ

What site offices ask us.

Does my site need a dust management plan?

Your council decides, so ask it first. The City of Armadale publishes its rule: Dust Management Plans are required when works that are being carried out may have the potential to create dust.

Other councils set their own requirements. If yours is not Armadale, ring its environmental health team before you pay for anything.

How far before the start date do I lodge it?

Again, your council sets it. Armadale says the plan and application should be submitted to the City 14 days prior to the anticipated start date, and Works should not commence until the Dust Management Plan is approved by the City.

The estimate works back 14 days using Armadale’s figure as the example. It is not a rule for any other council.

What goes into a plan?

DWER’s guideline scores a site and places it in one of four classifications, 1 to 4. Where other land uses are within 100 metres, works in the dry period (1 October to 31 March) lift a class 2 site to class 3, and class 3 to class 4.

We work out your classification at the site look, not on a web page. The plan then sets out the controls — fencing, watering, stockpiles, stabilising cleared ground — who is responsible for each, the monitoring and the complaint procedure.

A neighbour has complained. What happens now?

Ring us. A complaint visit is from $190: we attend, check the fence, the watering and the stockpiles against your plan, and write up what we found and what changed, ready for you to send on.

Do you supply the water cart?

No. Watering is your earthworks contractor’s cart at your contractor’s rate. We write the schedule it follows and check on inspection that it’s being run — which is why a plan on its own doesn’t keep sand on site.

Does a summer job cost more than a winter one?

In visits, not in rates. From 1 October to 31 March we inspect weekly, because dry sand and an afternoon sea breeze are how drift complaints start. The rest of the year it’s fortnightly. A visit is $190 either way.

Book a site look

Tell us the site and the start date.

We ring back within one working day to book a time on site with you or your super.

  • Lots or hectares and the start date let us price the plan before we arrive.
  • The council tells us which lead time to work back from.
  • Complaint already on file? Say so in the phone call and we come first.

Rather talk? (08) 9000 0605, Monday to Friday from 6:30am.

No payment and no obligation. We ring to book a time.