AMPLINE

Joondalup · Licensed electrical contractors

Home EV charger installs across Perth

Charged overnight, off your own switchboard. We supply, install, test and certify 7 kW and 22 kW home chargers — cable run, switchboard work and solar diversion priced before we knock.

Electrical contractor EC000000 (placeholder) Est. 2019 · every install certified From $1,890 supplied & installed
FORTY KILOMETRES OF RANGE, EVERY HOUR. switchboard $1,890 supplied · installed · certified

A 7 kW charger adds ~40 km of range an hour — plugged in at 9pm, full by morning.

Charger

Extra cable run

+0 m

First 5 m included in the price. $38 per extra metre — same metre rate at either charger.

Options

7 kW single-phase charger — supplied + installed$1,890
Estimated install$1,890

Totals display to the whole dollar. Final figure confirmed at the free site check — no surprises on the day. Bringing your own charger? That's a grid line, not a slider — installs from $820, quoted to your unit.

Sends your setup straight into the booking form.

What we install

Home chargers from $1,890 installed

Every price below is supplied, installed, tested and certified by a licensed electrical contractor — charger on the wall, certificate of compliance in your inbox.

7 kW home chargers

The overnight standard. Single-phase smart charger, app scheduling, charges on your cheapest tariff window.

$1,890 installed

22 kW three-phase chargers

For three-phase homes. Full-rate charging when your car's on-board AC charger can take it — we confirm both at the site check.

$2,790 installed

BYO charger installs

Bought the charger with the car? We'll mount, wire, test and certify it — quoted to your unit's specs.

from $820

Extra cable runs

Switchboard on the wrong side of the house? First 5 m is included; extra conduit priced by the metre, same rate at either charger.

$38/m beyond the included 5 m

Switchboard upgrades

Older boards weren't built for a car. RCBO protection plus load management so the charger and the oven never argue.

$650

Strata & apartment installs

Quoted after the strata walk-through — metering and common-power rules differ building to building, so an honest price starts there.

Quoted after the walk-through

Est. 2019 ABN 00 000 000 334 Licensed electrical contractor EC000000 (placeholder) Every install tested, tagged & certificate-of-compliance issued Chargers set to charge on your cheapest tariff window Clean boots, tidy cable runs, no mystery holes

From the driveway

Three installs, three quieter evenings

“Six months of queueing at the shopping-centre chargers with the Model Y. Ampline had the 7 kW unit on the garage wall by lunch, and I haven't seen that car park since. It just charges while we sleep.”
Marcus T · Currambine 7 kW install
“Our 1978 switchboard still had ceramic fuses. They upgraded the board, added the load management, and talked us out of the 22 kW we didn't need — the honesty sold us more than the price.”
Lyn & Peter H · Duncraig 7 kW + switchboard
“The solar diversion is the party trick. On a clear day the Kona is charged by lunch on nothing but the roof. The app shows the sun doing the work — my power bill barely noticed the car.”
Sarah K · Padbury 7 kW + solar diversion

Demonstration reviews — written for this fictional business.

Service area

Based Joondalup, installing metro-wide

Northern corridor to the Rockingham line — if you're in the Perth metro area, we'll get the van to you. Most installs are booked within the week.

Same install price metro-wide. The only thing that changes with your address is how early we leave the depot — the cable run and the switchboard decide the rest, and the Charge Fit above prices both before we knock.

Outside the metro? Ask anyway — we run a country loop every few weeks for grouped installs.

INDIAN OCEAN Yanchep Wanneroo Hillarys Ellenbrook Scarborough Morley Midland Perth CBD Fremantle Cannington Armadale Cockburn Rockingham Joondalup — home base

Straight answers

Questions we get on every quote

Can any house take a 22 kW charger?

Honestly — no. A 22 kW charger needs three-phase power, and most Perth homes are single-phase. We check what's coming into your meter box at the site visit before you spend a dollar. And even on three-phase, your car's on-board AC charger sets the real ceiling — many cap at 7–11 kW, and we'll tell you yours.

Will a charger blow my old switchboard?

That's exactly what the switchboard upgrade line is for — RCBO protection and load management so the charger backs off when the oven, aircon and pool pump pile on. We check the board first on every job; if yours is fine as-is, we'll say so.

How long does an install take?

Half a day, most homes. Longer cable runs or a switchboard upgrade can stretch it to a full day. You'll get a testing walkthrough and the certificate of compliance before the van leaves.

Does it charge off my solar?

With the solar diversion module, yes — when the sun's out, it steers excess generation into the car instead of the grid. On a clear Perth day that's genuinely free driving. Without the module the charger simply draws from the grid like any appliance.

Do I need council approval?

No — it's electrical work under your own roof, done by a licensed contractor, tested and certified. The exception is strata buildings, where the by-laws and metering need a walk-through first — that's why strata installs are quoted after it.

Book an install

Tell us about the car and the driveway

Use the Charge Fit above and your estimate arrives with the booking — or just send the form and we'll price it on the phone.

We'd call you back within one business hour (7am–5pm, Mon–Sat) to lock in your free site check.

Give us a name to ask for.
A phone number we can call back — digits, spaces and + are fine.
Which suburb is the driveway in?

Demo form — nothing is sent anywhere. On the real site this books straight into the job system.