Suspended slab soffit
$92/m² formed face
Props, bearers, joists and ply to the underside of the slab. Set out to the project engineer’s drawings.
Formwork subcontractor · Welshpool WA
Suspended slabs, columns, cores and blade walls for head contractors across the metro — priced per square metre of formed face, on this page, tonight.
18 carpenters, two leading hands, our own props and ply — 650 m² of deck a pour, and a priced schedule of rates back within two working days of drawings.
Rates are per square metre of formed face, supply and fix, our props and our ply. Level one builds the deck; every level after it re-uses that deck and bills at 88 per cent of the level-one rate.
$92/m² formed face
Props, bearers, joists and ply to the underside of the slab. Set out to the project engineer’s drawings.
$118/m² formed face
Single- and double-sided wall forms with walers, ties and braces. Both faces counted where both are formed.
$135/m² formed face
Square, rectangular and blade columns, clamped and plumbed, stripped and re-set on the level above.
$148/m² formed face
Shaft boxes, kickers and landings. The dearest face we form, because the access is the job.
88% of the level-one rate
Applied automatically from level two up, on every element. It is in the estimate, not in a negotiation.
Not ours to price
Supplied by others at their rate. We will not guess somebody else’s number into your tender.
Every formwork subbie in Perth quotes on request. Here are the rates, and here is the repeat-level discount you would otherwise have to negotiate for.
Measured differently in your bill of quantities? Send it as measured. We price to your schedule rather than argue about the method.
A four-level deck is priced below to start you off. Change any of it underneath — and every level count you did not pick stays priced at the same size.
Suspended slab soffit drawn at level one 3 repeat levels ghosted above
Every extra level lowers the effective rate and raises the total. On this deck the rate has fallen $8.28/m² from the level-one rate, and the total has risen every step of the way. Give one subbie all four levels; split them across four and you pay the level-one rate four times.
The bay drawn above gets denser as the deck grows. The rate per square metre does not move with the size of the deck — only the total does. A 100 m² pour and a 2,500 m² pour are the same rate at the same number of levels.
What the other level counts cost, same deck, same element
You are pricing a job tonight and three subbies have not called back. Here is what we do differently.
The schedule is on the page. Put our number in your tender, then ring us to firm it up — not the other way round.
18 carpenters, two leading hands, and a yard in Welshpool holding our own props, bearers and form ply. No hire schedule turning up as a variation.
Level two onward bills at 88 per cent. It is in the arithmetic above, it is in the subcontract, and it does not need to be argued for at week six.
Tell us when yours shuts and we sort the queue by that date. If we cannot make it we say so the same day rather than go quiet.
“First subbie I have priced off a published rate. The tender number and the subcontract number were the same figure, which almost never happens.”
“Four suspended levels, no lost days on the strip cycle. Their leading hand ran the re-set while we were still pouring the one below.”
“They told us the crane and the pump were not in their rate before we asked. Saved a fight at the first progress claim.”
Demonstration copy for a fictional business. On a real build these come from the client’s own referees and their reviews feed — and they are never marked up as structured data on a page that is not real.
Yard in Welshpool. Suburb-level only on this page — the suburbs are real, the business is not.
The tender date field is the one nobody else gives you. Fill it in and we sort our pricing queue by it.
A priced schedule of rates comes back within two working days of us having structural drawings, and we will ring before that if anything in the measure looks off.
Demonstration only — nothing was sent and nobody will call. On a live build this posts to the client’s CRM and raises a task against the tender date.
Want one pointed at your customers? We build lead-generation pages for Perth trades, subcontractors and SMEs — procedurally drawn, fast, and honest about what they publish.