Trapline Trade Waste

Grease arrestors · Perth metro

Grease arrestors for Perth kitchens, sized the way the permit officer sizes them.

Supply, installation and scheduled pump-outs out of Welshpool — cafes, restaurants, bakeries, pubs and institutional kitchens. Tell us what comes out of your kitchen and we will draw the tank: capacity, depth, how often the truck comes and what a year of it costs.

17 years on Perth kitchens DWER-licensed pump-out carrier Water Corporation permit applications lodged with you

This kitchen, installed $11,100 3,000 L in-ground arrestor, 12 m of drain, asphalt made good. Pumped out 4 times a year, about $2,320.

The Section — your tank, drawn to scale

fixed 0–3 m axis
Cross-section of the grease arrestor A scale cross-section against a fixed three-metre depth axis.
3,000 L arrestor — $11,100 pumped out every 14 weeks — 4 a year, about $2,320

The truck comes when grease and settled solids together reach a quarter of the wet depth. The hatched block under the grease is the settled solids, carried up so you can see the sum against the rule.

Meals a day280

280covers a day

Counted the way a permit application counts them — covers out the door, not seats.

Kitchen

Trading days

Trading days do not change the install by a dollar. They change how often the truck comes, and that is the bill you will actually notice.

Where it goes

Sewer invert900 mm

How far down your sewer junction sits. The tank is only legal in the ground if its outlet can still fall into it.

Drain alteration12 m

12 mnew drain

New drainage from the kitchen to the arrestor, in AS/NZS 3500.2 grades.

Making good

Headroom

A bigger tank does not change what you are allowed to put down the sink. It buys you weeks between pump-outs.

What the install costs

The Water Corporation’s permit officer sets the size that goes on your permit. We size it the way they do and we do the application with you — but their number is the one that binds.

How often the truck comes

14 weeks between pump-outs
That is an estimate from a typical grease load for this kitchen, not a promise. We open the arrestor and check it — we never assume it. Your permit may also set a maximum interval whatever the load says, and if it does, that interval wins.


What we do

Six things, and the honest floor under each one.

Prices are Perth metro, ex GST, and they are floors — the number the smallest real version of that job comes to. The estimator above cannot produce a cheaper install than the floor on the first card, because that is the same minimum.

Supply and install, in-ground

Precast arrestor from 1,000 to 10,000 L, excavation, bedding, risers to grade, inlet and outlet baffles, connection and commissioning to AS/NZS 3500.2.

From$5,500

Scheduled pump-out

Full evacuation, walls and baffles scraped, lid seals checked, waste tracked to a licensed facility by a DWER-licensed carrier and the docket emailed the same day.

From$330 a visit

Permit application assistance

We fill in the Water Corporation industrial waste permit application with you, draw the sketch it wants, and answer the officer’s questions when they come back.

From$390

Drain alterations

New kitchen drainage to the arrestor at the grades the standard sets, in PVC or cast iron where the fit-out demands it, with a licensed plumber’s sign-off.

From$145 a metre

Sampling point and sign-off

Downstream sampling point built to the permit’s requirement, the as-installed sketch, and the plumbing sign-off the permit officer asks for at inspection.

From$480

Emergency overflow attendance

An arrestor coming back up the floor waste on a Friday night. We pump it, we clear the outlet, and we tell you honestly whether the tank is too small or the cycle is too long.

From$690 after hours

  • 2009Trading out of the same Welshpool yard since 2009, on Perth kitchens the whole time.
  • Lic. PL0000Plumbing contractor licence (placeholder pattern). Every connection signed off by a licensed plumber.
  • DWER-licensedGrease trap waste is a controlled waste in WA. Our carrier is licensed and every load is tracked.
  • $20mPublic liability, and workers’ compensation for every person who goes down a hole.

What people say

Three kitchens, in their own words.

Trapline is a fictional business, so these are demo reviews — written the way the specific, unglamorous ones actually read.

“We had been pumping the old 1,000 out every fortnight and paying for it. Trapline measured the covers, said the tank was a fifth of what a charcoal kitchen needs, and put a 5,000 in over one weekend. We are on fourteen weeks now and the floor waste has not backed up once.”

Dilan R.Charcoal chicken shop, Osborne Park

“I rang about a grease trap because the landlord said I needed one. They asked what was on the menu, said a coffee and sandwich shop does not put fat down the sink, and told me to ring the Water Corporation and put a basket strainer in. Did not charge me for the call.”

Bec T.Cafe, Victoria Park

“Fit-out drawings said grease arrestor by others and nobody had priced it. Trapline had the permit application in within a week and shot levels on the sewer before quoting, which the other two did not. The number they gave us was the number on the invoice.”

Marco S.Restaurant fit-out, Northbridge

Where we go

Welshpool yard, Perth metro run.

The install crew works the whole shaded area. The pump-out truck runs a fixed weekly route through it, which is why a scheduled arrestor is cheaper than a phone call at 9pm.

Trapline Trade Waste service area A stylised map of the Perth metropolitan area from Joondalup in the north to Rockingham in the south and Midland in the east, with the Welshpool yard marked and the Indian Ocean and Swan River drawn. Joondalup Malaga Midland Osborne Park Perth & Northbridge Victoria Park Fremantle Cannington Canning Vale Armadale Rockingham Welshpool — the yard Indian Ocean Swan River

Diagrammatic, not a survey. If you are just past the dashes — Mandurah, Yanchep, the hills — ring us anyway; we go there for installs, and we will tell you honestly whether a scheduled pump-out route reaches you.

Asked constantly

Six questions we answer on the phone every week.

What size grease arrestor do I actually need?

The way the plumbers do it: your covers a day multiplied by the litres each cover sends down the sink, then the arrestor is sized to hold the peak two-hour discharge — two fifths of the day’s flow. A 280-cover a la carte restaurant works out at 5,600 litres a day, 2,240 litres of required capacity, and the smallest catalogue tank above that is the 3,000 L. The Water Corporation’s permit officer sets the size that goes on your permit. We size it the way they do and we do the application with you — but their number is the one that binds.

How often does it get pumped out, and what does a year cost?

When the grease and settled solids together reach a quarter of the wet depth. For that same 280-cover restaurant on a 3,000 L that is about every 14 weeks — four visits a year, roughly $2,320. The honest upper end matters more: a charcoal, fry and wok kitchen doing 280 covers seven days a week on a 3,000 L hits the quarter-full line in six weeks, and the dearest running year the calculator above can produce is a 960-cover charcoal kitchen on a 10,000 L — nine pump-outs, $11,610 a year. Nobody quotes the running cost. It is usually the bigger number.

Do I need a Water Corporation permit?

If you discharge trade waste to sewer in Perth, yes — an industrial waste permit from the Water Corporation, and it is the permit that sets your pre-treatment, your sampling requirement and your service interval. We fill the application in with you for $390, draw the sketch it asks for, and answer the officer when they come back with questions. We cannot promise you an outcome and we will not pretend to.

My sewer connection is shallow. Does that change anything?

It changes everything. An arrestor works on gravity: the outlet has to sit above your sewer junction or nothing leaves the tank. Bigger tanks are deeper and their outlets sit lower — a 10,000 L outlet is 800 mm down, a 1,000 L is 350 mm. If the tank your kitchen needs cannot reach your sewer, the answer is a pump station and a variation to your permit, and that is not a number we would guess at from a web page. Move the sewer chip above to 450 mm and watch the drawing refuse the job.

Can it go inside, or does it have to be in the ground?

Above-ground units go inside a tenancy where there is no yard to dig — a strip shop, an upper-floor kitchen, a heritage frontage. They top out at 2,000 L in our range, they need floor space and a real access route for the hose, and the sewer invert stops mattering because the unit sits on your floor and drains to a floor waste. Above 2,000 L of required capacity, inside is not an option and the drawing will tell you so.

What if it turns out I do not need one?

Then we say so and you keep your money. A coffee and pre-packaged menu does not put fats or oils down the sink in any quantity a permit officer cares about — a basket strainer in the sink and a conversation with the Water Corporation is the whole job. Try the first kitchen chip above: the page refuses to quote it, deliberately. We would rather tell you now than sell you a tank.

Book it

Tell us what comes out of the kitchen. We will come and shoot levels.

A site measure is free and it takes about forty minutes: covers on the lid, levels on the sewer, a look at the access route, and a number you can hand to the landlord.

Best number for the yard to ring back on.

Covers out the door on a normal day. Rounded to the nearest forty is fine.

We call back within one business day, and if the arrestor is overflowing now, ring the yard instead of filling this in — (08) 9000 0407. After hours attendance starts at $690.

  1. We ring you back and ask three questions the form does not: what is already in the ground, who owns the building, and when the fit-out has to open.
  2. We come and shoot levels — forty minutes with a lid key, a dumpy level and a tape. You get the covers count, the sewer invert, a sketch and a fixed price.
  3. We lodge the permit with you and book the dig. The same truck that installs it runs your pump-out route afterwards, so the driver knows what your tank looked like last time.

This is a demonstration build by Sapience Analytics. Want one pointed at your customers?

Every pixel here is drawn by the page — no stock photos, no template. The estimator is a real model with real floors, and it refuses the jobs it should refuse. We build these for Perth trades and SMEs.