SPANRIGHTSCAFFOLDING

Maddington · Perth metro-wide

Scaffold hire & erection, certified before anyone climbs.

Fixed scaffold, roof edge protection and aluminium towers across the Perth metro — measured on site, erected by SB-licensed crews, and handed over with the certificate in your hand. Your painter starts Monday because the frame stood Friday.

  • Since 2012
  • SB-class high-risk work licences
  • $20M public liability

SCAFFOLD PLANNER

Live estimate

12 m × 6 m — face 72 m²

$5,400erect + dismantle + 4 weeks’ hire

Fixed scaffold at $75/m² of scaffold face — site measure & handover certificate included.

+$576/week after week 4  ($8/m²/week)

Demo estimate only — the real number comes from a free site measure. Ground conditions, access and ties can move it, and we say so on site, not on the invoice.

12 m
6 m
4 wks

What we hire & build

Honest metres, honest rates.

Every job prices from the same public meters the planner uses. The site measure confirms it — it never inflates it.

Two-storey scaffold

from $75/m² · min $1,200

Erect + dismantle + 4 weeks’ hire, priced on the scaffold face (length × height). Planked lifts, guardrails, toe boards and mesh on the working lift.

Single-storey scaffold

from $75/m² · min $1,200

Same meter as two-storey — height changes the engineering, not the rate. Under 4 m changes who can legally build it: see licensing in the FAQ.

Roof edge protection

from $48/lm · min $900

Guardrail systems for re-roofs and gutter work, priced by roof-edge metres. Extends at $5/lm/week after the included 4.

Aluminium mobile towers

$260/week · delivered

Set kits to a 6 m platform, delivered and collected. Flat weekly rate from week one — no 4-week inclusion, and we say so up front.

Extra hire weeks

from $8/m²/week

The first 4 weeks are in the erect price. After that, fixed scaffold runs $8/m²/week and edge protection $5/lm/week — no re-erect fees.

Site measure & certification

Included

Handover certificate before anyone climbs — it’s not an extra, it’s the job. 30-day inspections and storm checks for the life of the hire.

The boring paperwork is the product.

A scaffold is a promise about spans and loads. Here is exactly how we keep it — including the parts other quotes leave out.

Licensed high-risk work

Above four metres, scaffolding is licensed high-risk work in WA. Our crews carry SB-class high-risk work licences — card numbers printed on your handover doc.

Inspected every 30 days

Hired scaffold gets a documented inspection every 30 days and after any storm. The tag on the standard tells you when we last looked — read it any time.

Ties, honestly

A two-storey wrap gets drilled wall ties — small patched holes are part of the deal, and we say so before we build. An untied wrap in a Perth southerly isn’t a scaffold, it’s a sail.

Wind rules, honestly

Over 63 km/h forecast we don’t hand over. The Fremantle Doctor is real and so is our anemometer — a delayed handover beats a bent frame.

Engineered where it counts

Standard configurations are pre-engineered. Cantilevers, hoardings and anything over 9 m get their own drawings — quoted on the measure, never guessed.

Insured for the real number

$20M public liability, certificates of currency on request — before we quote, not after you ask twice.

SINCE 2012 HRW LIC. SB 0000 (pattern) $20M PUBLIC LIABILITY 30-DAY TAG INSPECTIONS

Demo reviews — written as sample copy

What the trades say when the frame is right.

“I told the client I’d start Monday, and I started Monday — because the scaffold was certified Friday. That’s the whole relationship with a scaffolder, right there.”
★★★★★Deano · painter, Thornlie
“The brickies stopped complaining about the lifts, which is the only compliment brickies give. Planks where they should be, mesh on, tags current.”
★★★★★M. Kovač · builder, Canning Vale
“Our gable got fixed without anyone dying, which was my whole brief. They door-knocked the neighbours for the boundary side and patched the tie holes like they promised.”
★★★★★Ruth · homeowner, Gosnells
Perth CBD Fremantle Midland Victoria Park Welshpool Cannington Canning Vale Thornlie Gosnells Armadale Success Maddington — base STYLISED MAP · PERTH METRO · NOT TO SCALE

Service area

Based in Maddington. Metro-wide by the same truck.

The yard is in Maddington, so the south-east corridor gets the sharpest travel times — but the crews rack the same truck for Fremantle, Midland or the CBD. If the address has a postcode starting with 6, we’ll measure it.

  • Maddington — base
  • Gosnells
  • Thornlie
  • Canning Vale
  • Cannington
  • Welshpool
  • Victoria Park
  • Armadale
  • Perth CBD
  • Fremantle
  • Midland
  • + all Perth metro

Straight answers

The questions we get on every measure.

How much does scaffolding cost?

Fixed scaffold runs $75/m² of scaffold face — that’s length × height, covering erect, dismantle and the first 4 weeks’ hire, with a $1,200 minimum job. A typical two-storey face of 12 m × 6 m is 72 m² — $5,400. What moves the number: access (can the truck park at the face?), ground conditions, ties, and anything needing its own engineering. The planner above does the honest arithmetic; the site measure confirms it.

How long can I keep it?

The first 4 weeks are included in the erect price. After that, fixed scaffold is $8/m²/week and roof edge protection $5/lm/week — the 72 m² face above runs $576/week from week 5. No re-erect fees, no surprises: the extension meter is printed on your quote from day one.

Do I need engineering?

Sometimes, honestly. Standard configurations — faces to 9 m, standard bays, standard loads — are pre-engineered. Cantilevers, hoardings, loading bays and anything over 9 m get their own drawings, quoted on the measure. If your job needs drawings, we say so at the measure, not mid-build.

Can my handyman build it?

Under 4 m platform height — yes, legally, with the manual and the right components. Over 4 m, erecting scaffold is SB-licence high-risk work in WA, and that’s the law, not our upsell. Our crews carry the licence; the handover certificate carries their card numbers.

What about my neighbours’ side?

A boundary wrap usually needs their yard for a day — to stand the frame, then again to drop it. We’ll door-knock with you, agree the day, and leave their side as we found it. It goes better as a knock than a note.

What happens in a storm?

Every hired scaffold gets a documented inspection after any storm, on top of the 30-day tag cycle — check the tag on the standard for the last date. And if the forecast tops 63 km/h on handover day, we wait: the frame can stand a day empty; it can’t stand being bent.

Free site measure

Tell us the face. We’ll bring the tape.

The planner’s spec lands in this form automatically. Send it and we’d call you back within one business hour to lock in a measure time — the measure itself takes about twenty minutes.

  1. 1You send the job — thirty seconds, no account, no spam.
  2. 2We measure on site and confirm the price against the same public meters.
  3. 3The crew erects, certifies, and hands you the certificate before anyone climbs.

Request a site measure & quote

Demonstration form — nothing is sent anywhere.

Please give us a name to ask for.
A phone number with at least 8 digits, please.
Which suburb is the job in?
Or call (08) 9000 0261 — 6:30am–4:30pm weekdays.

This is a demonstration build by Sapience Analytics.

Want one pointed at your customers — your suburbs, your meters, your phone ringing? Every pixel here is hand-built and procedural, and yours would be too. danny@sapienceanalytics.com.au

Talk to Sapience Analytics